Construction of new vessel NB 188 - Patagon XI is in process at ASENAV S.A

news-details

The construction in process of NB 188 - Patagón XI at ASENAV S.A for their good client Patagonia Wellboat.

This will be a Live Fish Carrier with a hold capacity of 3,000 cubic meters, the largest built so far in North and South America with a design developed 100% by the well experienced engineering department of ASENAV S.A, including the Fish Handling System.

The delivery date is estimated for 2Q, 2023 and this project is our 11th construction of this type of vessel.

Her Main Particulars are:
Overall Length: 79.80 m
Breadth Molded: 17.20 m
Draft Max: 6.15 m
Total Power: 3,000 kW
Diesel-Electric Propulsion System

ASENAV S.A shall continue to deliver innovative and high-quality solutions to their clients!

You can share this post!

Submit News